SCHMEDTHENKE WERKZEUGBAU

© 2020 by DIA179 Berlin

×

SCHMEDTHENKE WERKZEUGBAU - Technische Informationen

New production hall for Schmedthenke Werkzeugbau GmbH, Gütersloh (North Rhine-Westphalia)

The expansion of the production facilities enables a portal machining center for the mechanical processing of milled parts up to 15.0 x 5.0 x 4.0 m and 100 t unit weight, as well as turned parts up to 4.5 m in diameter and 80 t unit weight.

2.850 m² gross floor area distributed across

2.500 m² production and logistics
350 m² office and social areas

Machine foundation for portal milling machine:
approx. 2.700 m³ concrete (34.00 m x 13.50 m x 5.75 m)

Start of construction: September 2011
Completion: February 2012

General planning DIA179

Planning and construction supervision LPH 1-9 HOAI
Property planning, structural engineering
Outdoor facilities and traffic planning